To build the future together with us!
contact us,now
STEEL MOULD

Prestressed pipe pile mould, Pole mold

Prestressed pipe pile mould, Pole mold
Pipe pile used in the construction of railway and bridge engineering. With the increase of the foundation construction, pipe pile as one of the main equipment, but also favored. Its frequency of use is higher, and the working conditions are poor, in the face of such a situation, pipe pile 2-3 years to be repaired, 5 years or so to consider the replacement.
We look for quality suppliers.
The customer needs to be given: drawings, tolerances, material requirements, packing and export methods, etc

Photos: